Pennsylvania rules, already on your calendar.
Quarterly integrity inspections, the annual production and waste report, bonding math and produced-water tracking for conventional operators, all in one place.
- Quarterly MIA grid
- Annual report pre-filled
- Bond math built in

What WellCollar tracks in Pennsylvania
| Filing | What WellCollar does | When |
|---|---|---|
| Annual Production & Status Report (incl. waste), 58 Pa.C.S. § 3222; 25 Pa. Code § 78.121 | Per-well production, status and waste pre-populated from your records for DEP's electronic system | February 15, for the prior year |
| Mechanical Integrity Assessment, 25 Pa. Code § 78.88 | Quarterly inspection grid for every operating well, findings become work orders, one-click annual summary | Quarterly; annual report February 15 |
Inactive-status, storage and EPA-permitted injection wells are exempt from the quarterly inspections.
Bonding and idle-well math, done for you
WellCollar compares per-well and blanket bonding for your well count and keeps the idle-well rules next to each well.
- Bonds: $2,500 per well or a $25,000 blanket bond plus $1,000 per new conventional well since mid-2022 (Act 96 of 2022)
- Idle wells presumed abandoned after 12 months without inactive status (58 Pa.C.S. § 3214)
- Produced water hauls to treatment or reuse facilities: track loads, destination and hauler

Related features
Common questions
Does WellCollar track Pennsylvania's quarterly integrity inspections?
Yes. Every operating well gets a quarterly inspection grid (25 Pa. Code § 78.88), findings open work orders, and the annual summary is one click.
Does it prepare the PA annual production report?
Yes. The annual production and status report, including waste, is pre-populated from your records for filing through DEP's electronic system.
See it with your own wells
Open the live demo company in one click, or send us your operator number and we'll show you your own wells loaded and ready.